 The dream has become a reality: a Church Centre, all on one site, that is open, visible and welcoming – all that we believe God wants us to be.
Building Progress
The building of a new Church Centre at Burlington Baptist Church, Ipswich is completed. In the Winter of 2008, the Church Centre was officially opened, many rooms are in full use with just a few rooms requiring final fitting. Check these pages for the latest news and pictures (which will be towards the top of the page). Click the images to see a larger picture.
Please see here for parking arrangements.
Progress
Information and plans | Summer 2006 | Autumn 2006 | Winter 2006/07 | Spring 2007 | Summer 2007 | Autumn 2007 | Winter 2007/08
Latest Pictures - March 2008
Church Centre conference table
Top floor furniture
February 2008
Foyer furnished with sofas and chairs
Cutting the ribbon at the commissioning service
Mayor with Senior Minister Simon Harris (centre) and site foreman (right)
Church Centre opening party on the patio
Church Centre opening party in the main ground floor room
Church Centre opening party barbeque
January 2008
Aerial view of Church and Church Centre
Aerial view of Church and Church Centre
Church and Church Centre
December 2007
Welcome area on the open Sunday
Drinks served from the kitchen
Hand over, keys to the Church
Hand over in the new Welcome Area
Hand over at the front door to the Church Centre
View of the Church and new Church Centre
Front view and car park
Front of church showing parking spaces
Second floor hall
First floor meeting room
First floor hall
Main stairs and lift
Welcome area
Ground floor hall
Kitchen ready for fitting out
November 2007
Preparation for drop curb and parking at front of Church
Top floor room carpeted
First floor hall showing partition
First floor hall carpeted
Ground floor hall carpeted
Top Floor Painted
Fisrst floor meeting room
Ground floor meeting room
Exterior from the back
October 2007
Electricity is connected
Prayer corner window from the new welcome area
Entrance door from Annexe to the Church
The Lobby
Top floor completed
Stair well ready for the Lift
September 2007
First floor store room
First floor painted showing doors to fire escape and store
Ground floor kitchen hatch
August 2007
Completed Exterior
Ground floor under-floor heating
Breaking through to the Church
For previous images and information, please use the left hand menu or links above
|