Church Centre (The Annexe)

Building Progress - Autumn 2007

In the 150th anniversary year of Burlington Baptist Church, Ipswich, the building of a new Church Centre was started. As we move into the Autumn of 2007 - several rooms are nearing completion, check these pages for the latest news and pictures (which will be towards the top of the page). Click the images to see a larger picture.

Please note: The car park is not available whilst the Church Centre is being built, please see here for alternative parking arrangements

Progress

Information and plans | Summer 2006 | Autumn 2006 | Winter 2006/07 | Spring 2007 | Summer 2007 Autumn 2007 Winter 2007/08  

November 2007

Preparation for drop curb and parking at front of Church Preparation for drop curb and parking at front of Church

Top floor room carpeted Top floor room carpeted

First floor hall showing partition First floor hall showing partition

Middle floor hall carpeted First floor hall carpeted

Ground floor hall carpeted Ground floor hall carpeted

Top Floor Painted Top Floor Painted

Middle floor meeting room painted First floor meeting room

Ground floor meeting room painted Ground floor meeting room

Exterior from the back Exterior from the back

October 2007

Electricity is connected Electricity is connected

Prayer corner window from Annexe Prayer corner window from the new welcome area

Annexe entrance door  Entrance door from Annexe to the Church

The Lobby The Lobby

Top floor completed Top floor completed

Stair well ready for the Lift Stair well ready for the Lift

September 2007

First floor store room First floor store room

First floor painted First floor painted showing doors to fire escape and store

Ground floor kitchen hatch Ground floor kitchen hatch

For previous images and information, please use the left hand menu or links above