The Annexe
Building Progress - Winter 2006/07
In the 150th anniversary year of Burlington Baptist Church, Ipswich, the building of a new Annexe was started. As we move into 2007 - the building continues to take shape, check these pages for the latest news and pictures (which will be towards the top of the page). Click the images to see a larger picture.
Please note: The car park is not available whilst the Annexe is being built, please see here for alternative parking arrangements.
Progress
Information and plans | Summer 2006 | Autumn 2006 | Winter 2006/07 | Spring 2007 | Summer 2007 | Autumn 2007 | Winter 2007/08
February 2007
The Kitchen area viewed from the Assembly room
The Basement steps shuttered ready for concrete pouring
The completed west wall - ground floor
The top floor south wall with gaps for future storage cupboards under the roof
January 2007
The completed steel structure
The last piece of the apex steel being fitted in to place
The last piece of back staircase in position behind the Church
The 3.8 ton staircase manoeuvred into position
December 2006
The main staircase
A staircase section being fitted in to place
A floor beam being lifted in for the ground floor
The ground floor being blocked in
The first bricks being laid
Wall foundations being poured
Preparing for wall foundations
For more images and information, please use the left hand menu or links above |